Matt replaced all the drywall on the backsplash area and we will wait and finish that as our last project. Meanwhile, our countertops are here (on the front porch). Each slab weighs 300 lbs. Wow. How do we even lift that? We have to have all the bottom counters in before we can set them, obviously. That means we are a few days off from that. Matt will have to fabricate the countertops for the sink, etc. (which I ordered on ebay) so that should be pretty intense. But the floors must come first. Matt set the remaining tiles last night and we will grout tonight. I also hung our "doorbell" on the side wall. Seriously this giant dinner bell or whatever it is-- was hanging outside our front door when we moved in as, I think, a notification system. This thing is so loud it could wake the neighborhood. I am feeling a little nostalgic and decided to hang it in the kitchen as seen in that first picture to the left of the fridge. (I replaced the pull with some old cutain ornamental things that I had just lying around). Thats all there is to report.